CPM Scheduling in Construction Disputes: What Attorneys Need to Know

Critical Path Method scheduling analysis appears in a significant percentage of construction disputes involving delay claims. Attorneys who understand the basics of CPM scheduling — what it measures, what it can and can’t prove, and where expert testimony is essential — are better equipped to develop delay claims and defend against them.

What CPM Scheduling Actually Shows

A CPM schedule models the sequence and duration of construction activities and identifies which sequence of activities determines the overall project duration — the critical path. Activities not on the critical path have float — time by which they can slip without affecting the completion date. Activities on the critical path have no float; a day of delay to a critical activity is a day of project delay.

The As-Planned vs. As-Built Problem

The central analytical challenge in delay disputes is comparing the as-planned schedule (what was supposed to happen) to the as-built record (what actually happened). A critical path delay analysis expert uses various methodologies — impacted as-planned, collapsed as-built, time impact analysis, windows analysis — to make that comparison and attribute delays to their causes.

Each methodology has different data requirements and different vulnerabilities under cross-examination. An expert who can explain why the chosen methodology is appropriate for the available data and defend it against alternative approaches is significantly more valuable than one who simply runs a schedule analysis without engaging with methodology.

Baseline Schedule Issues

The baseline schedule — the contractually-approved schedule against which the project is measured — is often the first contested issue in delay litigation. Questions about whether the baseline was realistic, whether it was properly updated, and whether schedule updates preserved the as-built record are frequently dispositive. The Associated General Contractors of America scheduling guide provides industry guidance on scheduling practices that serves as a useful reference point for these disputes.

What Schedules Don’t Prove

CPM analysis can establish a sequence of events and their timing with reasonable precision. It cannot, by itself, establish causation or responsibility. The expert’s schedule analysis must be combined with factual analysis — correspondence, meeting minutes, RFIs, daily reports — that links specific events to specific parties and their contractual obligations.

Leave a Comment

Your email address will not be published. Required fields are marked *

Disclaimer: This website uses an AI-powered automated system to process and publish contributor submissions. Our team provides manual monitoring, but occasional oversights may occur. If you have any concerns or objections regarding published content, please contact us for review and possible removal. We do not intentionally endorse or promote illegal or prohibited content.